亚洲欧美一区二区激情,精品少妇爆乳无码av无码专区,国产AV无码片毛片一级,国产精品无码免费专区午夜,久久激情亚洲中文字幕,中文字幕精品无码亚洲幕,日韩午夜福利无码专区a,精品久久久无码人妻中文字幕

Your location > Home > News

Announcement of the Requirements for the Implementation of Mandatory Product Certification Management Converted from Production License

AddTime:2019-07-13    Read:2946

In accordance with the requirements of the Decision of the State Council on Further Reducing the Catalogue of Industrial Product Production License Management and Simplifying the Examination and Approval Procedure (No. 33 of Guofa [2018]), the General Administration of Market Supervision has decided to change the management of explosion-proof electrical products from production license to compulsory product certification (CCC certification). In order to ensure the smooth implementation of CCC certification and smooth and orderly work cohesion, the relevant requirements are announced as follows:

I. Date of implementation of certification

Since October 1, 2019, explosion-proof electrical appliances, household gas appliances and household refrigerators with a calibrated volume of more than 500L have been included in the scope of CCC certification management. The designated certification bodies (certification bodies and laboratory appointments will be announced separately) have started accepting certification commissions; the market supervision of production and Construction Corps of provinces, autonomous regions, municipalities directly under the Central Government and Xinjiang. The Administration Bureau (departments and committees) (hereinafter referred to as provincial market supervision departments) has stopped accepting relevant production license applications and has accepted the termination of administrative licensing procedures according to law.

Since October 1, 2020, the above products have not obtained the compulsory product certification certificate and labeled the compulsory certification mark. They are not allowed to leave the factory, sell, import or use in other business activities.

II. Requirements for the work of designated certification bodies

The designated certification authority shall formulate rules for the implementation of certification in accordance with the requirements of the general rules for compulsory product certification and the corresponding rules for product implementation, and complete the registration with the General Administration of Market Supervision (the Department of Certification Supervision) by September 25, 2019.

The Link between CCC Certification and Production License Management

(1) Before October 1, 2020, the above products produced by domestic enterprises shall be manufactured, sold or used in other business activities with a valid production license or CCC certification.

(2) For enterprises that have obtained production licenses, if the above products do not continue to be produced after October 1, 2020 (including), there is no need for CCC certification; otherwise, the Certification Commission shall be submitted as soon as possible and CCC certification shall be obtained before October 1, 2020.

(3) The designated certification authority shall recognize the relevant examination and test results, formulate relevant conversion schemes (including differential inspection items, supplementary factory inspection, etc.) and implement the certification entrustment of enterprises with valid production licenses, issue CCC certificates to products meeting the certification requirements, and at the same time, issue CCC certificates to enterprises. The local provincial market supervision department notifies the list of licensed enterprises. In principle, the cost of certification and inspection in the process of certificate conversion shall be borne by the finance.

(4) Provincial market supervision departments shall promptly go through the formalities for cancellation of production licenses according to the notification of certification bodies and the expiration of production licenses. On October 1, 2020, the General Administration of Market Supervision cancelled all valid production licenses that had not been converted.

(5) For the products manufactured during the period of validity of the production license, the original packaging (meeting the requirements of the production license) can be continued after October 1, 2020.

主站蜘蛛池模板: 国产亚洲欧美日韩二三线| 国产亚洲欧美在线观看三区| 天堂tv亚洲tv无码tv| 欧洲熟妇色 欧美| 久久男人高潮女人高潮| 欲色影视天天一区二区色香欲| 美女露出奶头扒开尿口免费网站| 国产成人欧美日韩在线电影| 国产午夜高潮熟女精品av| 国产巨大爆乳在线观看| 国产又黄又硬又湿又黄的视| 四虎国产精品成人免费久久| 精品国产v无码大片在线观看| 2021国内精品久久久久精免费 | 国产麻豆 9l 精品三级站| 日韩国产亚洲欧美成人图片| 好男人社区影院www| 国产精品熟女在线视频| 国产精品国产三级国av| 免费无码午夜福利片69| 少妇人妻无码精品视频app| 亚洲精品99久久久久久欧美版| 成人无码精品一区二区三区亚洲区| 免费人妻无码不卡中文视频| 青草av久久一区二区三区| 菠萝菠萝蜜午夜视频在线播放观看| 无码人妻斩一区二区三区 | 裸体美女无遮挡免费网站| 欧美va天堂va视频va在线 | 国产三级韩国三级日产三级| 午夜精品影视国产一区在线麻豆| 老司机久久99久久精品播放| 米奇777四色精品人人爽| 亚洲综合久久成人av| 亚洲欧美国产国产一区二区三区| 国产国拍亚洲精品永久69| 欧美牲交videossexeso欧美| 亚洲成无码人在线观看| 18禁免费吃奶摸下激烈视频| 看全色黄大色黄大片 视频 | 亚洲综合激情另类小说区|